INSTALLATION
Below is a video and a few important points. You can click below to access the Installation Manual.

UNDERSTANDING THE SYSTEM
TOP HUNG SYSTEM
EACH PANEL HAS SET OF TOP ROLLERS
EACH PANEL HAS SET OF BOTTOM GUIDES
BOTTOM TRACK ACTS AS A GUIDE
IMPORTANT TO KNOW
CORRECT FIXINGS
Use the correct fixing when installing the Head Track
SUFFICIENT FIXINGS
Use a good number of fixing when installing the Tracks.
MAXIMUM FIXINGS
Concentrate fixing at the stacking area in the Head Track
COUNTERSUNK
Floor Track fixings must be countersunk Stainless steel
TOOLS REQUIRED
Drill
Drill Bits
Screw Driver Bits
4mm Hex Key
3mm Hex Key
Packers
Suitable Fixings
Level
Small No.2 Phillips Screw Driver
Small 4mm Flat Screw
Countersunk bits
6mm Spanner
LEVEL AND SQUARE
TOP TRACK
Installed first. Fixed to the top beam
BOTTOM TRACK
Installed level and square to top track
SIDE POSTS
Installed level and square to the top and bottom track

IMPORTANT
DON'T FIT TO THE OPENING
The system is installed level and square. Fix the opening to suit the tracks if the opening is not square and level
THE SYSTEM MUST BE LEVEL AND SQUARE
The system will not operate if not installed correctly